Learn when stamped drawings are required for an Edmonton building permit, what projects need engineer approval, and how

Yes, in many cases you do need stamped drawings for an Edmonton building permit, especially when a project involves structural changes, load-bearing elements, or safety-critical components. The City of Edmonton requires engineer stamped drawings to confirm that the proposed work meets Alberta Building Code standards and does not compromise structural integrity. Knowing when stamped drawings are required can prevent costly delays, rejected applications, and stop-work orders.
At Edmonton Structural Engineers, this is one of the most common questions we hear from homeowners planning renovations, additions, or basement developments. Below, we explain exactly when stamped drawings are required, when they are not, and how to ensure your Edmonton building permit drawings are approved the first time.
Stamped drawings are construction plans reviewed, signed, and sealed by a licensed professional engineer. In Edmonton, these drawings confirm that the structural design complies with the Alberta Building Code and is safe for construction.
When the City requests engineer stamped drawings Edmonton, they are looking for professional accountability. The engineer’s stamp confirms calculations have been completed and the design has been verified for safety and performance.
The City of Edmonton uses stamped drawings to reduce risk. Structural failures can result in serious safety issues, so the City relies on licensed engineers to validate complex or structural work. This process protects homeowners, occupants, contractors, and future buyers.
If your project involves modifying or removing load-bearing walls, stamped drawings are required. This includes open-concept renovations, widening doorways, or installing beams and columns.
In these cases, Edmonton building permit stamped drawings are mandatory before approval.
Any time a beam or column is added or modified, the City requires engineer stamped drawings Edmonton. Beam sizing, material selection, and load paths must be calculated properly.
Basement developments often trigger stamped drawing requirements if they include structural modifications, such as new load paths, underpinning, or foundation alterations.
Home additions, second-story expansions, and major renovations almost always require stamped drawings Edmonton permit approval due to increased structural loads.
Attached decks often require stamped drawings, especially if they connect to the structure or exceed certain size thresholds.
Foundation cracking, underpinning, or structural reinforcement requires engineering review and stamped drawings for permit approval.
Projects like flooring replacement, painting, cabinetry, or minor non-structural updates typically do not require stamped drawings.
Non-load-bearing partitions that do not affect structure or safety systems may not require engineer involvement. However, confirmation is always recommended before applying.
City reviewers assess drawings for:
If stamped drawings are required but missing, the permit application will be rejected.
Many permit delays occur because homeowners submit Edmonton building permit drawings without realizing engineering is required. This leads to resubmissions and extended timelines.
When stamped drawings are included upfront, applications move through review faster with fewer comments.
Engineering completed early reduces redesigns and clarifications later.
Stamped drawings ensure the structure performs safely long term, reducing future repair costs.
A structural engineer reviews the scope of work and determines what drawings and calculations are required.
Depending on the project, a site visit may be completed to assess existing conditions.
The engineer completes load calculations and designs required structural elements.
Once finalized, drawings are stamped and ready for submission as part of the Edmonton building permit application.
Costs vary based on project complexity, size, and required analysis. Simple beam designs are typically lower cost than full structural renovations.
While some homeowners view stamped drawings as an added expense, they often save money by avoiding delays and construction issues.
At Edmonton Structural Engineers, we work with City of Edmonton permit reviewers daily. We understand what they expect and how to prepare drawings that meet approval standards.
Our drawings are clear, accurate, and formatted for efficient review.
We assist homeowners from early planning through permit approval and construction support.
No. Only projects involving structural or safety-critical changes require stamped drawings.
You can submit, but if engineering is required, the City will reject the application until stamped drawings are provided.
Only licensed professional engineers registered in Alberta can provide stamped drawings.
Sometimes, but relying on City feedback can delay your project. Consulting an engineer first is faster.
Not directly, but unpermitted or non-engineered work can create issues during resale or inspections.
Simple projects may take a few days. More complex designs may take one to two weeks depending on scope.
Understanding whether you need stamped drawings for an Edmonton building permit is critical to a smooth renovation or construction project. Structural changes almost always require engineering, and submitting stamped drawings upfront prevents delays, rejections, and unnecessary stress.
Homeowners who plan ahead and work with a qualified structural engineer enjoy faster approvals, safer construction, and long-term peace of mind.
Edmonton Structural Engineers offers trusted residential structural design, inspections, and permit-ready reports. Safe, accurate, and fully code compliant.